Ground preparation & underground concrete base both finished

Despite the huge load of snow, the ground preparation has proceeded smoothly and is now finished.

The underground concrete base is ready, next step is the construction of the concrete pillars and the water tank concrete bases.

In parallel, the construction of the water tanks is ongoing at TBS Yard AB in Torsås, see picture below.

2018-01-19 153410jpg